Low Impact Stormwater Engineering
Installation of underground stormwater storage chambers.
Distribution piping to chambers.
Location: Lake Whatcom, WA
Builder: Highline Construction
What We Did: Civil engineering plans for a new stormwater installation.
Stormwater engineering was prepared to support the redeveloped of an existing site for a new custom single family residence. The plans incorporated the Lake Whatcom Special District Overlay regulations specifically pertaining to Phosphorus treatment.
Additional work included preparation of the Temporary Erosion Sediment Control Plans (TESC), Stormwater Pollution Prevention Plan SWPPP, and an Engineers Stormwater Report in accordance with Washington Department of Ecology Stormwater Management Manual for Western Washington, and the Lake Whatcom Special District regulations.